Condition Summary by Segment (2019-2023) (0)
| Critical Repairs |
| Preventative Repairs |
| Routine Maintenance |
Soil Loss (2019-23) (2)
| mild damage |
| moderate damage |
| severe damage |
Braiding (2019-23) (3)
| recovering damage |
| mild damage |
| moderate damage |
| severe damage |
Undesignated Trail Connection (2019-23) (4)
Drainage Issue (2019-23) (5)
Obstruction - Tread (2019-23) (6)
Obstruction - Verticle (2019-23) (8)
Obstruction - Verticle (2019-23) (9)
% Grade (2019-23) (11)
| -21+ |
| -16 to -20 |
| -11 to -15 |
| -6 to -10 |
| 0 to -5 |
| 0 to 5 |
| 6 to 10 |
| 11 to 15 |
| 16 to 20 |
| 21 + |
% Outslope (2019-23) (12)
| ≤-21.000000 |
| ≤-16.000000 |
| ≤-11.000000 |
| ≤-6.000000 |
| ≤0.000000 |
| ≤6.000000 |
| ≤11.000000 |
| ≤16.000000 |
| ≤20.000000 |
| ≤182.266251 |
Width (Ft) (2019-23) (13)
| ≤1 |
| ≤3 |
| ≤6 |
| ≤8 |
| ≤10 |
| ≤16 |
| ≤20 |
| ≤30 |
Surface Firmness (2019-23) (14)
Surface Type (2019-23) (15)
| Asphalt |
| Concrete |
| Crusher Fines |
| Gravel |
| Natural |
| Other |
| Road Base |
Detailed Condition by Station (2019-2023) (16)
Grade (2019-23) (18)
Outslope (2019-23) (19)
Width (2019-2023) (20)
Surface Firmness (2019-23) (21)
|